Project area showing desert land, vegetation, and power lines.

项目区域

该项目全长2.2英里,位于马里科帕县非建制区和皮奥里亚市。项目区域南起科尔特贝拉大道,北至乔马克斯路。环路303以南约2000英尺的埃尔米拉奇路将重新划线,以适应立交桥的交通;但环路303以南的道路不会进行任何重建。

A map of  the project area in unincorporated Maricopa County and the City of Peoria. The map shows that the project stretches from Corte Bella Drive north to Jomax Road. Between Corte Bella Drive and Loop 303, El Mirage Road will be restriped. North of Loop 303 to Mariposa Grande Lane, the existing roadway will be reconstructed. Between Mariposa Grande Lane and Happy Valley Road, a new roadway corridor will be constructed. From Happy Valley Road to Jomax Road, the existing roadway will be reconstructed. The map also provides the locations of the McMicken Dam Outlet Channel,  Loop 303, the Coldwater Ranch and Vistancia neighborhoods, the Beardsley Canal and local streets and residential areas near the project area.